The Greenline Extension Ribbon Cutting

The Greenline Extension Ribbon Cutting
Aug 4th @ 10:00 am

Join us as we celebrate the completion of the $2 million extension project, located at the southern end of The Greenline.

The extension is approximately 1,200-feet long, connecting to existing walking trails along the San Antonio River at Mission Reach stretching from the historic missions through downtown, The Pearl, and up to Brackenridge Park. It will feature a 10-foot wide mixed-use pathway, a 43-foot long tunnel underneath the Union Pacific Railroad line, landscaping, drainag…More details at the Event Website below.

Details

Date:
08/04/2021
Time:
10:00 am
Website: